IS successfully completed a 235 KV capacitor bank upgrade projects for Western Area Power Administration (WAPA)
WAPA in the state of Arizona provided IS with a very challenging and interesting project. WAPA has two capacitor banks located in Arizona which had a serious failure preventing operation of both banks. Scope of this upgrades project includes:
-
Initiated the engineering walk dow
-
Scavenged documentation and deciphered the rest
-
Mobilized a prep team to identify and label the entire system that was to be modified
-
Design teams worked in tandem designing the new system and developing conversion plans while the other team developed the PLC code.
-
Engineered a new protocol to interface new to old.
-
Performed multiple layers of testing at ISI facilities and then invited WAPA team to witness the testing.
-
Performed system installation
-
After successful field commissioning of the new system configuration, both capacitor banks went on line May 30th, 2008 without incident.

IS recently successfully completed a project
at VA Hospital in Orlando, Florida
Central Energy Plant for VA hospital Campus
-
Over 20M Watts available from Caterpillar Diesel Engine Generators for Emergency situations
-
85 sections of Siemens medium voltage switchgear customized by Industrial Power Systems
-
GE RX3i PLC Controlled with redundant master controllers and 10 individual controllers
-
SCADA is Wonderware-based with redundant servers and 6 operator stations
| |
-
Close to 10,000 tags
-
Over 500 screens
-
Over 250 devices networked utilizing Modbus/ Modbus TCP protocols
-
Power meters
-
Protective relay
-
IP Cameras
-
Caterpillar Generator Controllers
-
Woodward governors and synchronizers with load sharing
-
ASCO Automatic Transfer Switches
|

|
|
|